electricity production

Supermai Hydropower Plant Halts Production Due to Flood Damage 1
NEPSE NEWS

Supermai Hydropower Plant Halts Production Due to Flood Damage

Hydropower Plant Suspends Operations Due to Flood Damage Heavy rains and resulting flooding have forced a temporary shutdown of the Supermai Hydropower Project. The 7.8-megawatt hydropower plant, owned and operated by Supermai Hydropower Limited, has sustained damage due to recent extreme weather conditions in the Mai River region. Continuous rainfall, coupled with devastating flooding and […]

Puwa 2 Hydropower Project Halted by Flood Damage 3
NEPSE NEWS

Puwa 2 Hydropower Project Halted by Flood Damage

Hydropower Project Suspended After Heavy Rainfall and Landslides The Puwa 2 Hydropower Project (4.96 MW), operated by People’s Power Limited, has been temporarily shut down due to severe weather conditions. Recent heavy rainfall has led to floods and landslides, causing significant damage to the project’s headworks area. This disruption has forced the company to suspend

Scroll to Top